
Asbestos Survey
An independent surveyor locates materials containing asbestos before building work starts. This inspection pinpoints exact hazards on‑site. The surveyor issues a comprehensive report to guide trades working on the premises.
Kelki targets the best
GoogleTrustpilot
Kelki targets the best
GoogleTrustpilot
An asbestos removal contractor in Devon to remove and dispose of hazardous materials safely.
An asbestos removal contractor in Devon carries out asbestos removal to safely strip hazardous materials from buildings. These pros remove cement roofs, floor tiles, and ceiling panels. They set up strict containment enclosures to prevent dangerous fibres from spreading into the air. They wear specialist respiratory protective equipment and thoroughly decontaminate the work area afterwards.
Before any works take place in Devon, an initial survey is carried out by an independent surveyor. The removal company then draws up a detailed plan of work submitted to the authorities before starting. Hazardous waste is double‑bagged, clearly labelled, and transported to an authorised disposal facility accompanied by waste transfer notes.

An independent surveyor locates materials containing asbestos before building work starts. This inspection pinpoints exact hazards on‑site. The surveyor issues a comprehensive report to guide trades working on the premises.

An independent specialist carries out a destructive inspection throughout a building destined for demolition. This thorough survey identifies all dangerous materials that need stripping out to protect demolition workers.

The contractor takes down corrugated cement sheets or roof slates containing asbestos. Technicians unfasten sections without breaking them to stop fibres escaping. They leave the framework ready for a new roof.

A specialist lifts old vinyl floor tiles containing asbestos fibres. They isolate the room with polythene sheeting, strip the tiles using specialist hand tools, and run high‑efficiency air filtration vacuums.

Technicians strip black bitumen adhesive residues from subfloors beneath old coverings. Using mechanical or chemical scraping inside a sealed area, they clean the concrete slab thoroughly for fresh flooring.

The team strips out suspended ceiling panels containing asbestos fibres. The project requires full enclosure of the work area and air extraction units. Removed panels are sealed in heavy‑duty hazardous waste bags.

The team strips sprayed fibrous insulation from steel beams or internal walls. This high‑risk work requires an airtight negative‑pressure enclosure. Technicians wet the coating thoroughly to keep airborne fibres to a minimum.

Hazardous materials are red‑bagged, clear‑bagged, and clearly marked with warning labels. The contractor transports the waste to an authorised transfer station with consignment notes tracking disposal.

Choose a specialist company holding relevant health and safety permissions for asbestos removal.
The total price depends on the factors listed below. The pro will confirm the exact price on their written estimate or quote based on your site requirements.
For each service and each town, Kelki explains the essentials: the services, when to call a pro and pointers to choose well. With « Call me back », you describe your need in a few clicks: your request goes to a professional of the trade in your area, and you then deal with them directly.
Major cities first, then all towns in alphabetical order. One click: your request is sent with the right location.
Ask around for recommendations, check reviews, and request detailed written quotes to compare methods. You can also consult official registers of approved asbestos contractors or describe your project on Kelki to get a call back from a local pro.
Yes, specialist contractors usually cover a wide radius around their base. Travel depends on their logistics and the scale of the project. Any equipment transport fees are detailed in their initial proposal.
The duration depends on the site size and removal methods. It can take from a few days for a domestic garage to several weeks for a commercial building. You must also allow for statutory notification periods before work starts.
Waste is placed inside sealed, heavy‑duty red and clear bags with standard warning markings. The contractor transports it directly to an authorised hazardous waste site, tracked with official consignment notes.
Rules require independence between testing and removal works. An independent surveyor should carry out the inspection. The removal contractor then uses this report to plan their site operations safely.
Occupants must stay out of the work area. The contractor builds an airtight sealed enclosure with negative pressure units to trap fibres. Once completed, a visual check and air clearance test are carried out before anyone returns.
The contractor writes a method statement and plan of work detailing protective measures. This is submitted to the relevant enforcement authority at least 14 days before higher‑risk works begin, though shorter notices may apply for urgent incidents.
Nothing: Kelki is 100% free for you. Describe what you need in a few clicks, a professional in your area calls you back and tells you their price. The service is funded by the professionals.
Messages are analysed by an AI to understand your need, and are not stored. Privacy
We use cookies to improve your experience and analyse site traffic. About our cookies