Skip to content

100% free for you · No obligation · A few clicks
Your need in one click
2.2 M+companies in our trades in CanadaYour request goes to the machinery movers in your area.
$0for you, 100% freeKelki is funded by the professionals. No obligation.
30 sto make your requestService, timeframe, town: a few clicks, and a professional calls you back.

Machinery Mover nearby

A machinery mover to relocate your equipment and reconfigure your workshops.

Machinery movers organise the relocation of production equipment, complete workshops, or factories. They step in during internal reorganisations, site moves, or the purchase of new heavy equipment. Their role involves dismantling machines, handling them, managing secure transport, and fully reinstalling them at the new operating site.

The project begins with a technical site visit to assess access, floor load constraints, and utility networks. The provider then drafts a method statement and a schedule. Their teams handle lockouts, methodical dismantling, lifting, and securing parts for transit. Upon arrival, they position the frames, carry out anchoring and connections, and assist with testing alongside your operators.

Your areaEverywhere in CanadaYour request goes to the machinery movers around you.
Your request · Machinery Mover

Which service do you need?

Free · No obligation

Machinery mover services

A technician checks the alignment and floor markings during the complete relocation of an automated assembly line
Common service

Production line relocation

Production line relocation includes full mapping, orderly dismantling, handling, and reinstallation of your entire manufacturing chain. Request this service when relocating a workshop or transferring a unit to another factory, to minimise machine downtime.

Free · No obligation
A technician meticulously disassembles the mechanical sub-assemblies of an industrial press using a cordless torque wrench
Common service

Machine disassembly

Machine disassembly ensures the mechanical removal of sub‑assemblies, part identification, and packaging of sensitive elements. This is necessary to remove bulky equipment from a building or before scrapping a large machine tool.

Free · No obligation
An operator carefully places hydraulic jacks and moving skates under a machine frame
Common service

Heavy equipment rigging

Heavy equipment rigging allows heavy loads to be shifted in tight spaces using jacks, air skates, and specialized dollies. It is required to rotate a heavy lathe, move a press, or load large frames onto a trailer.

Free · No obligation
An industrial electrician safely disconnects power cables in a locked-out control cabinet
Common service

Electrical disconnection

Electrical disconnection involves locking out cabinets and power sources, identifying each conductor, and removing power links. This operation takes place just before the physical movement of the machine to work safely according to current standards.

Free · No obligation
A technician connects power conductors in an automated cabinet after reinstalling the machine on site
Common service

Electrical reconnection

Electrical reconnection handles wiring to main panels, routing cables through existing trays, and insulation testing. Request this once geometric leveling is complete, before launching the first dry run cycles.

Free · No obligation
An operator heat-seals a waterproof aluminum cover to protect industrial equipment against maritime corrosion
Common service

Export crating

Export crating protects equipment against salt corrosion and moisture during sea transport using vacuum heat‑sealed covers. This protection is required when shipping machining lines, moulds, or robots overseas.

Free · No obligation
A professional assembles custom wooden interior bracing to secure a sensitive machined part
Common service

Custom wood crating

Custom wood crating includes manufacturing crates tailored to the weight and dimensions of your parts, with reinforced bracing. Choose this service to protect fragile parts, spindles, or sensitive control cabinets.

Free · No obligation
A specialist secures an oversized machine onto a lowbed trailer using transport chains
Common service

Oversized load transport

Oversized load transport handles the road haulage of machines exceeding standard width, height, or weight limits. It includes obtaining necessary permits, arranging escort vehicles, and managing the designated route.

Free · No obligation
An equipped technician remotely controls the lifting and movement of a large industrial machine in a workshop

When to call a machinery mover

Is this your situation? A professional in your area calls you back to discuss it.Free · No obligation
GOOD HABITS ✦ CHOOSE WITH CONFIDENCE ✦

How to choose a machinery mover

Check that the company has the required qualifications for lifting work and electrical authorisations for cabinet interventions.

  • Always ask for proof of professional indemnity insurance and a policy covering goods in transit at their true value.
  • Require a technical visit to your site before they draw up a commercial proposal.
  • A detailed estimate or quote should list the planned machinery, human resources, method statement, and respective responsibilities.
  • Be wary of providers who price an operation without inspecting access points, ceiling heights, slab resistance, or underground pipes.

What makes the price of a machinery mover

The price depends mainly on the elements below. The exact price is the one the professional displays or writes on their estimate or quote, drawn up for your needs.

What affects the price

  • Weight and dimensions of the machines to be handled
  • Access difficulties to buildings and ceiling heights
  • Road distance between the two operating sites
  • Level of mechanical dismantling and disconnection required
  • Heavy lifting equipment needed on site

Good to know

  • Price rules vary by province: the information on this page applies nationwide.

Get called back by a machinery mover

For each service and each town, Kelki explains the essentials: the services, when to call a pro and pointers to choose well. With « Call me back », you describe your need in a few clicks: your request goes to a professional of the trade in your area, and you then deal with them directly.

Your request100% free
TradeMachinery MoverLocationEverywhere in CanadaServiceTo chooseTimeframeYou choose
A pro in your area
calls you back · 100% free for you

Your most common questions

How to prepare for the machinery mover's visit?

Gather the technical files for the machines, layout plans, electrical diagrams, and lifting instructions. Also, point out the main isolation points for fluids and power to the provider. Finally, clear the aisles around the work areas to allow easy access for forklifts and rigging equipment.

Who handles draining the fluids before transport?

Draining oil, coolant, and hydraulic circuits is usually done by your maintenance team or entrusted to the provider if agreed in the quote. Fluids must be removed and treated according to industrial waste regulations before any lifting and securing of equipment.

What professional insurance should you ask for?

Ask for the company's professional liability insurance certificate as well as goods in transit insurance. The latter must cover the replacement value of your equipment in case of damage during dismantling, lifting, transport, or reassembly. Ensure the compensation limit matches the machines' value.

How does the technical site visit work?

The project manager inspects the condition of the machines, anchors, doorways, ceiling height, and floor load capacity. They identify external obstacles for positioning mobile cranes. This step allows them to draw up a precise lifting plan and cost the necessary technical means without unforeseen risks.

What is a work method statement for this type of project?

A work method statement is a detailed planning document prepared between your company and the provider before work begins. It identifies risks linked to simultaneous activities on site, defines safety measures, organizes emergency procedures, and lists the necessary authorizations for technicians working in your facility.

Does the provider recommission the machines after the move?

The provider carries out leveling, floor anchoring, fluid connections, and electrical wiring. They perform rotation direction tests and assist with dry runs alongside your operators. However, fine‑tuning production parameters and ensuring machined part compliance remain the responsibility of your setters.

What factors affect the cost of industrial relocation?

The price depends on the tonnage of the equipment, the complexity of mechanical dismantling, and the transport distance. Using heavy equipment, such as high‑capacity cranes or lowbed trailers, also influences the amount. Time constraints imposed to minimise production downtime will also vary the final bill.

Will the professional come out for just one machine?

Yes, teams handle single machine tools just as well as entire factories. Whether moving a shop press a few metres or transporting a machining centre across the country, the specialist adapts their lifting and transport equipment to the unit involved.

How much does Kelki cost?

Nothing: Kelki is 100% free for you. Describe what you need in a few clicks, a professional in your area calls you back and tells you their price. The service is funded by the professionals.

Need a machinery mover??
Get a call back.

100% free for you · No obligation · Describe your need in a few clicks
Machinery MoverEverywhere in CanadaMachinery mover request · 100% free for youCall me back